Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas more than two weeks ago
Male, 64 years, born on 27 March 1962
Moscow, not willing to relocate, prepared for business trips
Reservoir Engineer
Specializations:
- Other
Employment type: full time, part time, project work/one-time assignment
Work experience 36 years 11 months
August 2017 — currently
8 years 9 months
Outback Property Soluntions
Australia
Programming Engineer
I am working as a volunteer on the Portal Development.
Responsible for creating and maintaining MySql database, generating codes for different functionalities, like login/logout, inserting, deleting, editing records, displaying records on the screen and presenting menu to users and etc. To do all this work I use algorithmic language PHP.
October 2014 — April 2015
7 months
OMV Petrom S.A. Branch in Kazakhstan
Aktau, www.petrom.comhttp://www.omv.com
Oil and Gas... Show more
Senior Reservoir Engineer
Responsible for planning and preparing dynamic simulations for Oil Fields and keeping production forecasts update, contributing in defining field development strategies and field management decisions and contributing in planning and preparing work over programs.
Key Achievements:
I have completed the Reservoir Simulation models for Aktas and Tasbulat fields using Eclipse 100. I have also analysed water injection processes and recommended optimal water injection rates and injection pressure for every water injection wells.
July 2010 — April 2014
3 years 10 months
QGC Ltd.
Principal Reservoir Engineer
Responsible for analysis of reservoir data, building a new and updating an existing reservoir simulation model of Coal Seam Gas fields using CMG GEM software, also responsible for Reservoir Surveillance and Integrated Asset Modelling using software, like F.A.S.T CBM, DSS, Petroleum Experts (GAP, MBAL, Prosper, Resolve, IFM, IVM and Model Catalogue). Also was responsible for Wells PDA analysis using DSS, OVS, IVM, MS Excel software.
Key Achievements:
• Generated and maintained IAM models by coupling Eclipse Reservoir models and GAP network model with PROSPER well models via Resolve for QGC fields which resulted in the optimisation of gas and water production.
• Calculated Wells and Network Maximum Potential Gas Production rate (MPP) for QGC asset areas.
• Completed the Reservoir Simulation model for a Pilot programme for gas injection for underground gas storage perspective;
• Conducted short-term production forecast (Best, Most Likely and Worst scenarios) for wells in Central Area (Berwyndale South, Kenya, Lauren, Codie, Bellevue and Argyle) which assisted in managing production costs and increasing production levels.
• Constructed single well and sector models in GEM to understand well flowing pressure that is subsequently used in FAST CBM to predict well production profile
• Constructed a well data base with locations coordinates, history (250 plus) for the Central area in preparation for production forecasting task.
October 2008 — November 2009
1 year 2 months
Santos Ltd.
Senior Reservoir Engineer
Responsible for analysis of reservoir data, building reservoir simulation models for underground gas storage perspective using Eclipse, history matching and field development planning for onshore conventional gas fields as part of the Santos- PETRONAS “Gladstone LNG” project.
Key Achievements:
• Converted the previous dynamic model of the ‘Arcadia’ CSG field to the new dynamic model. The previous model was generated by using CMG GEM software. Used Eclipse 100 and Eclipse 300 to create the new model that enabled easier comparison of results.
• Completed the Reservoir Simulation model for Grafton Range and Bony Creek field for gas injection for underground gas storage perspective;
January 2001 — September 2008
7 years 9 months
Karasu Operating Company
Reservoir Simulation Supervisor
Responsible for supervision of 2 Reservoir Engineers and 1 Technical Assistant; analysis of reservoir data, building reservoir simulation models using Eclipse or CMG Black Oil Simulator, history matching and field development planning for onshore oil fields, workover programs and preparing of processes for new wells drilling purposes and waterflooding purposes. Also responsible for task distributing between team members, managing and helping them to achieve positive results.
Key Achievements:
• Analysed geology and reservoir data for Kelameddin and Mishovdag onshore oil field rehabilitation programme. Recommended work-over program that lead to an increase in oil production and a decrease in water production.
• Created a simulation model for Mishovdag field water flooding programme and made recommendations as to which Wells required conversion from production to water injection. Recommendations were accepted and implemented and led to an increase in production of 500%.
• Created a simulation model for Kelameddin field water flooding as EOR technique programme.
August 1998 — December 2000
2 years 5 months
Reservoir Modelling Centre, SOCAR
Reservoir Engineer
Responsible for analysis, prediction of main field development indices, building reservoir simulation model in Eclipse by using UNIX Workstation for offshore oil fields.
Participated in the following projects:
• Guneshli oil field rehabilitation programme
• Joint TotalFinaElf-SOCAR “Shallow Water Guneshli Reservoir Study”
• Joint AIOC-SOCAR “Guneshli Reservoir Study”
August 1996 — August 1998
2 years 1 month
SSRDI Gipromorneftegas, SOCAR
Leading Engineer
Responsible for mathematical modeling, prediction of the oil and gas field development factors in petroleum reservoir development simulation division of laboratory “Oil & gas field development analysis and projects”.
Participated in the following projects:
• Guneshli field development project
• Gryazevaya Sopka field development project
• Pirallahi field development project
Developed software for prediction of the offshore oil and gas field development factors, ultimate oil recovery factor calculation by using personal computer.
March 1986 — August 1996
10 years 6 months
Scientific - Production Association Nord
Leading Engineer
Involved technological process simulation, development software on Automatic Control Systems on the base of personal computer, was responsible for installation and system support of local Net and modem BITCOM.
Skills
Skill proficiency levels
About me
I am a Reservoir Engineer with more than 15 years of experience in Reservoir Survellance, Reservoir Simulation, Reservoir management and Integrated Asset Modeling
Higher education
1985
Higher education
Languages
Citizenship, travel time to work
Citizenship: Australia, Azerbaijan
Permission to work: Australia, Azerbaijan, Belarus, Georgia, Kazakhstan, Kyrgyzstan, New Zealand, Russia
Desired travel time to work: Doesn't matter
