Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas today at 11:15
Male, 61 year, born on 1 November 1964
Moscow, willing to relocate, prepared for business trips
Hydrotechnical construction engineer
3 $ in hand
Specializations:
- Construction project manager
Employment type: full time, part time, project work/one-time assignment
Work experience 27 years 5 months
February 2018 — December 2023
5 years 11 months
Engineering division “AO ASE “ (ase-ec.ru)
Chief specialist /Expert
Technical support to the initial design stage of the international project,
Find and Analysis building-construction’s materials according to the project design, compare their characteristics and specifications and standards according to design requirements, and their cost data MARKETING Analysis. Project cost estimate. Collection-analysis-evaluation of technical parameters,
Human resources, equipment take into account their risk and impact on cost, Timing of construction. Identify potential manufacturers-suppliers construction materials, Preparation, organization and registration. Organization registration system and document control. Build schedule, risk analysis.
Checking and calculations received offers -prices.
Review and analysis of the technical requirements of the project base design documents and drawings according to the Specifications and Initial technical requirements and the quantity and quality of materials and equipment, comparison of requirements for lists of construction materials according to the project, volume schedules and delivery. Supporting procurement procedures, checking technical specifications, preparing standard forms for requesting commercial proposals from contractors and checking their entry into the relevant company resources. Negotiating with potential contractors and suppliers. Support in the preparation and verification of tender documents of suppliers. Checking the availability of a complete package of documents from suppliers and contractors for tender and procurement
July 2011 — December 2016
5 years 6 months
GPNB GAZPROM_NEFT / UAE / Iraq Branch
UAE
Chief specialist / Manager Pipeline Interface
The primary responsibility is construction and technical support to perform scope of work oil-Gas and water pipelines and Infrastructure’s; and control systems.
• Drafting experiences SOW at the level of FEED & EPC contracts.
• Evaluations & Inspection of potential Bidders &contractors.
• Coordination and management of projects works.
• Stakeholder’s Relationship management.
• Technical support (survey and investigation) during the process of Engineering’s design &construction.
• Documentation &Permits approvals Support duration the project SOW process,
• Manage&Control mobile repair- maintenances teams.
• Design of engineering typical solutions for the construction and protection of objects in places with a high level of groundwater and groundwater, weak soils, and crossings pipelines with existing facilities (rivers, roads, cables, underground communications), according to international standards.
• Construction Service roads, hydraulic dams, culverts, communications and infrastructure. Strengthening of slopes.
• Preparation of technical specifications SOW for engineering surveys: topographic, geological, hydrological in future construction areas:
I. Oil and gas pipelines and control stations,
II. Water pipelines,
III. Water intake facilities, water treatment and pumping stations.
• Evaluation and verification of the AUDIT of potential contractors.
• Coordination of the route and lanes for diversion of main pipelines with representatives of local authorities and all stakeholders.
• Preparation of technical documentation - data at the stage of preparation of the draft (tender) for the construction of pipelines.
• Preparation and control of the performance quantity of completed construction work in accordance with the construction plan and budget execution.
• Application of unique international technologies and experience in the construction and protection of concrete structures in difficult climatic conditions and corrosive environments
• Coordination and Harmonization of standard draft decisions for the construction and protection of pipelines crossing existing facilities (rivers, roads, cables and underground communications), with owners and local authorities.
• Control and preparation of technical data necessary for the execution of design works for the construction of pipelines using the Horizontal Directional Drilling "HDD" at the intersection with water obstacles: rivers, dams, canals, main roads.
• Site Construction control of oil and gas pipelines, including those adjacent to the infrastructure of underground communications and BVS control stations, roads and culverts.
• Construction of facilities to protect existing underground communications and infrastructure facilities.
• Management and control of the execution of construction works on the sites:
(Plan Planning), (Compliance of quality and volume of QA / QC construction),
(preparation of project documentation, closing and commissioning).
• Interaction with the general contractor, subcontractor at the site.
• Registration of work stoppages of contractors at the site and assistance in resolving conflicts.
• Organization of construction and monitoring of the construction process on sites in accordance with the HSE rules.
• Checking and Acceptance of the project execution documentation from the general contractor and transferring them to the operation service.
• Control and accounting of incoming project documentation from project organizations, introduction of comments and amendments and their registration in the register of documents.
• Obtaining and issuing permission to start construction works PTW.
• Interaction with the general contractor and inspection bodies in the process of handover objects to operational services and closing them in accordance with contracts.
December 2009 — January 2011
1 year 2 months
JSC Zarubezhstroytechnology / Libyan Branch,
Libya
Construction, Real Estate, Architecture... Show more
Engineering Specialist OF obstacles (Crossings &Intersections areas)
The Specialist in overcoming of obstacles and protection of underground communications (Oil and gas pipelines) and pipes of water supply and electric cables at crossing with the railway and highways, according to international safety standards and practice,
• Definition of a place and technical specifications of the existing underground crossing and infrastructure facilities: Pipelines, cables, which crossings along right of way (ROW), Railway project, their locations, specifications to establish list of kinds of obstacles.
• Coordinate technical support to Engineering team to approve architectural drafts ,typical solutions procedure, Engineering design ,from client and local authority to obtained PTW, permission to starting construction work and activity,
• Provide required support together with owners and local authority during construction activity to EPC contractors to access to work site ROW;
• Reporting to project management In case work is stopped at the site, registration documents and reports, required for claim acting response.
• Coordination of process of designing of the necessary projects according to demanded standards and receptions of the necessary coordination with the owner and the customer of the given project,
June 2007 — May 2009
2 years
JSC STROYTRANSGAZ
Oil and Gas... Show more
Construction supervision engineer
Oil pipeline construction SHABAB-1 .Modification BVS & pipelines inside Abqaiq plant.
• Carry out the safety brief, instruction of the working groups
• To obtain PTW and MS before starting work from ARAMCO HSE representative.
• Manage camps construction and mobilizations preparing work at site,
• Coordinated activities with architects, surveyors, contractors, planners, construction managers, etc. to manage project work
• To ensure workers’ attendance and assign tasks to foremen
• To organize workers in the construction site
• To assign obligations on daily basis and guaranteeing to if they are carried out To ensure the machinery and substances are provided in time to workers
• Control Installation underground power and communications cables, pipes water supply and sewage system according to scope of the work and international standards.
• To report the company on a daily basis with reports about progress in construction site
• Trained the workers on using the health and safety equipment’s and on following the safety protocols made mandatory by law
• Provided assistance and gave valuable feedback in meeting the technical problems and facing the unexpected challenges
• Analyzed the data pertaining to structural engineering and verified the designs planned for the structures
July 2000 — July 2007
7 years 1 month
STYX company, Russia /Moscow (Airport Sheremetyevo)
Telecommunications, Communications... Show more
Construction supervision engineer
Carry out the safety brief, instruction of the working groups,
To receive PTW and MS before starting work from Airport representative,
Manage mobile team for Construction and maintenance and service all facilities ,
Planning scope of the work with management team.
Checking and clarify the engineering drawings and Method of statement MS ,with engineering team
To order required equipment’s to perform our tasks,
To order required material and delivered to site work location,
To ensure workers’ attendance and assign tasks to foremen,
Escorts working groups to site work and back to base.
Perform landscaping, construction Asphalt and service roads
Manage mobile team for Construction and maintenance and service all facilities in and out of airport, Water and power supply and communication lines.
Installation and service electrical and communication lines and cables.
January 1990 — November 1995
5 years 11 months
Ministry of water resources
Civil Hydroconstruction engineer
Coordination the works with international team of consultants and specialists teams ,
Project acceptance and validation documentation.
Checking calculations and drawings for construction of concrete and earthen structures.
Control the volume and quality of the implementation of works on natural sand and sand-gravel on career.
Management of topographic and geotechnical survey and investigations work on the project.
Supervision of construction works for water well drilling and grouting,
Control and management of works on laboratory and quality validation derived transported construction materials.
Skills
Skill proficiency levels
About me
!- Specialist with good experience,
Successful background in corporate communications,
stakeholder’s relations or government relations;
Technical support and preparations for the handover
completed projects.
• Windows, MS Office, АUTOCAD, Maps, GPS. Navigation and coordination.
• Safety Management System and Safety Performance of Hazardous Operation
• Executive Negotiations, General Management, PMP Project Management.
• HSE Management system Training (HSE MS Basics, Leadership & commitment, Hazard and Effects management process (HEMP) incident investigation, performance monitoring, HSE Auditing.
**************************************************************************
Higher education (master)
1989
Higher education (master)
MGSU- MOSCOW STATE UNIVERSITY OF ENGINEERING Civil - hydraulic engineer,
Civil Hydraulic Engineering, •Engineering and Construction of rivers hydraulic structures dams and channel’s
Languages
Citizenship, travel time to work
Citizenship: Russia
Desired travel time to work: Doesn't matter

