Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was more than two weeks ago

Male, 40 years, born on 6 November 1985

Moscow, I want to relocate, not prepared for business trips

Civil engineer

Specializations:
  • Other

Employment type: full time

Work experience 15 years 7 months

August 2018currently
7 years 10 months
WSP IL PRIMO A4 Residential (A4 Tower)
Senior Engineer
Project’s Client: EMAAR Led Consultant: WSP The Il Primo is a 77-storey tower with the top level serving as a steel structure crown. It includes 3 podium levels and 6 levels of basement and parking. It is located on the north side of the Dubai Opera House between Dubai Mall and Burj Khalifa. The project features super-prime luxury residential apartments, associated amenities, retail and cultural elements. These apartments are set to be one of the most desirable addresses in the world, with panoramic views of the Dubai Fountains and Arabian Gulf. The work within the building area will include both hard and soft landscaping to the areas outside the demise of the Podium. Our role involves design and supervision consultancy services. The enabling works commenced on site last December 2016, involving diaphragm walls and 325 piles. The main contract works commenced on site last November 2017.
August 2014currently
11 years 10 months
Senior engineer
Responsibilities Duties Working as a senior engineer in several magnificent projects across Dubai • Responsible for investigation and checking of the sites for the project. • Preparing and maintaining the site progress report (Daily, weekly, monthly). • Follow and coordinate the sub-contractors schedule and reports submittals. • Materials & Shop Drawings Submittal. • Checking of the safety of workers and others at the site. • To ensure the quality of the product used in the construction. • Maintain all the records of the projects.
March 2017March 2018
1 year 1 month
WSP DWTC C3 & C5 (Two Facilities Towers)
Senior Engineer
Project’s Client: DWTC Led Consultant: WSP C3 & C5 area an offices buildings, consists of 13 and 15 stories buildings respectively, located in Za’abeel district in Dubai.
June 2016March 2017
10 months
WSP The Dubai Mall Expansion (The Grand Ramp):
Senior Engineer
Project’s Client: EMAAR Led Consultant: WSP | PB Main Contractor: Dutco Balfour Beatty This project is located inside Dubai Mall Car parking (Cinema Parking & Grand parking) Construction of ramps in the existing car park area to get quick access to Levels P5, P6 and P7 of the Cinema car Park The anticipated duration of the project is 9 Months which provides for 1) Construction of Demolition of existing car park 2) Strengthening Of Existing Column 3) MEP Services Relocation and new Installation 4) Construction of New Ramp 5) Finishes 6) Contract Value : AED 34 Million
March 2014June 2016
2 years 4 months
WSP Al Barari projects
Senior Engineer
Project’s Client: Al Abwab Real Estate Led Consultant: WSP | PB Main Contractor: Sustainable Builders Seventh Heaven: The Seventh Heaven development is a two towers with cascading apartments with large terraces housing 157 residential units including exclusive duplexes, penthouses, sky villas, garden homes, basement parking and retail spaces in line with Al Barari’s passion for greenery. Major Components: PT Slabs, GRP Fly beams with steel supports. Phases/Milestones: Structures completion April 2016. Power on August 2016. Footprint/Built-up Area (Sq ft): 398370 / 1345984 Total Construction Contract Price as awarded to Contractor in AED: 570,707,000 AED Ashjar: Ashjar development is five clusters with total of 13 residential buildings, five and six stories each. Address: Plot # 6455911 Wadi Al Safa (Dubai Land) Sheik Mohammad Bin Zayed Road (Opposite Falcon City, Global Village) Major Components: PT Slabs, GRP Fly beams with steel supports. Phases/Milestones: Structures completion April 2016. Power on August 2016. Footprint/Built-up Area (sq ft) : 1049520 / 792170 Total Construction Contract Price as awarded to Contractor in AED: 289,129,150 AED
June 2012June 2013
1 year 1 month
Aluart contracting company Dubai
Senior Engineer
Detailed Responsibilities • Working as a project engineer in AL Forsan Hotel in Abu Dhabi as a sub-contractor for finishing works (Pertinent to this I was responsible for increasing the productivity for my stuff in the blockwork and the tiling activities taking in consideration the quality required and subsequently preparing the bill for the completed works in this site) • Working in Deerfield’s Town Square in Abu Dhabi as a sub-contractor for finishing works (Pertinent to this I was responsible for increasing the productivity for my stuff in the blockwork and the tiling activities taking in consideration the quality required and subsequently preparing the bill for the completed works in this site) • Working in Le Reve tower as a project engineer for the fall ceiling works. • Working as a designer engineer in aluminum division for the company projects in Somali land (After the company finished its civil works in UAE, then it focused on the aluminum field (cladding and curtain walls) which is the main division on the company, and I participate with the design aluminum team which was a new challenge for me)
October 2010April 2012
1 year 7 months
Axal Arabia for construction (Ben Laden Group) Saudi Arabia
Civil Engineer
Job Duties • Prepare information regarding structure specifications, materials, equipment, and construction time. • Direct activities of workers engaged in preparing drawings and specification documents. • Conduct periodic on-site observation of work during construction to monitor compliance with plans. • Inspect project sites to monitor progress and ensure conformance to design specifications and safety or sanitation standards. • Monitoring materials, methods, and the tools involved in the construction Detailed Responsibilities • Working as a site engineer in prince Noura university project (Regarding to this I was responsible about the concrete works for 3 buildings with stuff of 70 carpenters and 35 steel fixer. And this required me to put schedule for the work progress and to know how distribute the carpenters and the steel fixers to their suitable locations and check out the materials in the store to keep the work running without stopping so we can finish the work progress as its scheduled in time without late take in consideration the required quality working in Le Reve tower as a project engineer for the fall ceiling works)
February 2010October 2010
9 months
Ideal Arabian constructions CO Jordan
Civil Engineer
Working as a site engineer in four stories residential building (Regarding to this I was responsible about checking the quality for the finishing works ( block and tiles)

Driving experience

Driver's license category B

About me

An experienced dedicated civil engineer, with a demonstrated history of working in the civil and constructions field. Skilled in AutoCAD, Microsoft office, analytical skills, structural skills, constructions techniques, technical engineering and planning skills. With a total of 11 years working experience in magnificent projects in the UAE. Investigation, Seventh Heaven development, Residential Buildings, Blockwork, Civil Engineering, Cladding, Curtain walls, Analytical Skills, Planning Skills, Reinforced concrete Design, Specifications, 2D, 3D, Autocad, Microsoft Excel, Microsoft Office, Microsoft Office 2010, Microsoft Outlook, Microsoft PowerPoint, Microsoft Word, SAP

Higher education

2010
Higher education
HASHEMITE UNIVERSITY
Civil Engineering, Bachelors Degree

Languages

Russian — Native

Citizenship, travel time to work

Citizenship: Jordan

Permission to work: Russia

Desired travel time to work: Doesn't matter