Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas more than a week ago
Male, 37 years, born on 13 August 1988
Moscow, willing to relocate, prepared for business trips
Project Manager
5 000 € in hand
Specializations:
- Project manager
Employment type: full time
Work experience 14 years 7 months
November 2018 — currently
7 years 6 months
LLC Tecnimont Russia
Moscow, www.mairetecnimont.com/
Construction, Real Estate, Architecture... Show more
Resident Project engineer (Civil & Structural part)
Expert review of the basic, design and as-built documentation. Control of the compliance with the Russian codes and regulations during the engineering and construction.
Adaptation of the FEED and Design Documentation in accordance with the Russian codes and regulations.
Analysis and decision making in accordance with the determined optimal variant on the minimal cost basis. Consideration and Coordination of Change procedures in the design arising during E&C (TQ, MAR), quickly resolves issues without the decline in quality of the construction facilities.
Analysis of the labor intensity of the designing. Interface with home office, field, Client, licensors and subcontractors.
Financial, technical and progress supervision of subcontractors (as NIIK, Peton/PMP, Renaissance construction, AECOM).
Working on AGPP project (Amursky gas processing plant).
January 2017 — July 2018
1 year 7 months
Saipem S.p.A.
Moscow, www.saipem.com
Construction, Real Estate, Architecture... Show more
Expert in Civil engineering
Audit of project design documentation (PD), detailed design (RD) and as-built documentation issued by third party organizations.
Adaptation of FEED and Design Documentation in accordance with Russian regulations and standards.
Compliance control of third-party subcontractors for the appliance of Russian rules and regulations used during design and construction. Review of construction method statements.
Analysis of project design and construction solutions and decision making in accordance with the determined efficient variant. Defining and approving of variation orders for extra-works during project activity. Liaising with subcontractors, clients and licensors.
Participation in consideration and coordination of changes for design decisions arising in the course of construction. Resolving of issues on daily basis related to the replacement of materials, products and structures in project activity.
Analysis of the labor intensity for the Engineering, Procurement and Construction. Preparation of Technical and Engineering proposals.
Assessment of man-hours required for the project activity, preparation of project implementation plans and schedules. Preparation and adjustment of the engineering schedules, project implementation schedules.
List of main projects of Saipem S.p.A. where was involved:
• Gazprom’s South Stream (Turkish Stream up to date);
• Novatek’s Arctic LNG-2.
December 2013 — January 2017
3 years 2 months
JSC Giprotruboprovod PJSC Transneft
Moscow, www.giprotruboprovod.transneft.ru/
Mining Industry... Show more
Senior engineer/Deputy head of department
Design of Construction Management Plan, Right-of-Way Design for trunk pipeline systems. Development of remodeling, technical re-equipment, overhaul and dismantling projects of main oil pipeline transportation objects and facilities (oil pumping station and etc.), subwater pipelines and ports.
Selection of necessary machines and equipment, temporary buildings and structures during the construction. Preparation of project implementation plans and schedules.
Construction site supervision. Passing of projects examination in Government authorities. Audit of project design documentation (PD), detailed design (RD) and as-built documentation issued by third party organizations.
List of main projects of PJSC «Transneft» where was involved:
• Yug Project;
• Sever Project;
• Increase in Transportation Of Oil Products in the Moscow Region;
• Eastern Siberia ‒ Pacific Ocean (ESPO) Pipeline System Extension Reconstruction of Oil Trunk Pipelines in Western Siberia;
• Zapolyarye – Purpe – Samotlor Pipeline System.
April 2012 — December 2013
1 year 9 months
JSC PIRS
Omsk, www.pirsoilgas.ru/
Mining Industry... Show more
Engineer
Design (Construction Management Plan) of trunk pipeline systems.
Development of remodeling, technical re-equipment, overhaul and dismantling projects of main gas pipeline transportation objects and facilities (gas compressor station and etc.) and subwater pipelines.
List of Clients of project where was involved:
• PJSC Gazprom;
• PJSC Rosneft;
• PJSC Transneft.
June 2009 — February 2010
9 months
PJSC ONHP
Omsk, www.onhp.ru/
Mining Industry... Show more
Engineer
Design Construction Management Plan for Primorsk Refinery 20 MTA capacity (VNHK up to date). Offsite and Utilities.
Skills
Skill proficiency levels
Driving experience
Driver's license category B
About me
Conscientious, organized, eager to learn, determined.
Excellent problem solving and analytical skills. Open minded and able to work in complex projects and environment.
Higher education
2018
Higher education
City Business School, Moscow
Master of Business Administration, Project Management
2010
Higher education
Civil Engineering Institue, Industrial and Civil Construction
Languages
Citizenship, travel time to work
Citizenship: Russia
Permission to work: Russia
Desired travel time to work: Doesn't matter
