Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas less than a week ago
Male, 53 years, born on 6 January 1973
Saint Petersburg, willing to relocate (Moscow, Saint Petersburg), prepared for business trips
Electrical engineer
Specializations:
- Design engineer
Employment type: full time, project work/one-time assignment
Work experience 19 years 5 months
August 2020 — currently
5 years 9 months
Kent LLP, Client Tengizchevroil, Future Generation Project, Tengiz field, Kazakhstan.
Atyrau, kentplc.com/contact-us/kazakhstan
Oil and Gas... Show more
Electrical System Owner
1. Responsible for the electrical work associated with the commissioning and start-up of electrical equipment and systems. Carrying out reports to the SCM and is responsible for the systematic execution of all work required to demonstrate system performance at the technical level.
2. Responsible for commissioning and start-up of high voltage, medium and low voltage, equipment and day-to-day electrical issues.
3. Reviewing of commissioning and start up strategies for electrical equipment, monitoring of work activities to ensure effectiveness and adherences to scope and Electrical Standards. Ensure spare parts descriptions are correct for critical equipment.
4. Reviewing design basis for interlocks, electrical power distribution, area classification, and National Electrical Code compliance, and/or all governing or adopted codes, as needed. Review, and approved electrical specifications and design drawings/calculations within scope of the project. Provided technical suggestions for engineering contractors on electrical power systems.
5. Act as System owner/focal point for assigned systems, ensuring, based on an overview across all disciplines, that which is required for a system completion is facilitated.
6. Supporting with the compilation of Commissioning manuals and procedures. Preparing of mark-ups for System / Subsystems.
7. Monitoring the Construction activity & ensure timely availability of subsystems & systems as a whole for in-time commissioning.
8. Perform commissioning and startup of necessary activities for subsystem and system. Co-ordinating and follow up for Vendor assistance required at site. Co-ordinating with other discipline during hook up and commissioning activities.
9. Identification of commissioning spares and 2 years operational spares requirement.
10. Performing Actions as a Discipline System Authority under Project PTW procedure.
January 2020 — August 2020
8 months
Daelim Industrial. DCC (Deep Conversion Complex) Project, Omsk, Refinery
Russia
Electrical commissioning supervisor
1. Act as Commissioning and Start-up Supervisor for Daelim, EP + Construction Management Company.
2. During the construction phase, led and participated in all the necessary electrical tests and inspections after each stage of construction along with the construction company reps and vendors, to confirm proper completion of works and electrical equipment.
3. Hand over to Gazprom Neft client and prove functional tests for systems and electrical equipment as per EPC project requirements.
May 2019 — November 2019
7 months
Maire Tecnimont / CORU (Combine oil refinery unit), Moscow Refinery
Russia, www.mairetecnimont.com/
Electrical commissioning supervisor
1. Participation in all the commissioning activities and subsequent day to day operation of the assigned plant.
2. Carry out the start-up activities in accordance with the operating procedures.
3. Carrying out periodical tests and verification to ensure that process and safety equipment are in good working condition;
4. Coordination with Maintenance for electrical equipment functional checks.
February 2017 — February 2019
2 years 1 month
Technip FMS/South Tambey LNG. Yamal LNG Project
Russia, technip.com
Oil and Gas... Show more
E&I Engineer
1. Supervision and Execution of construction and commissioning works for process electrical substation, to verify their performance and compliance with regulatory documents, with further handover to production.
2. Participation in inspection of completed works. Preparation of method statement and regulations for the commissioning and start up switching.
3. Collaboration with Field Engineering Department to carry out in depth analysis of electrical drawings to determine decisions for possible improvement.
4. Commissioning and startup of Siemens substations 35/10/0,4kV and GE Compressor stations.
September 2013 — September 2016
3 years 1 month
September 2013 – Lukoil-Overseas LLP. West Qurna-2 Project, Iraq
Other regions, www.lukoil-overseas.ru
Oil and Gas... Show more
Senior Electrical engineer
1. General technical and effective coordination of all commissioning activities performed on a designated area of the field.
2. Verification of work packs scope of work to key out commissioning scope and permit requirements. Control of construction team to ensure Commissioning readiness of mechanically completed system.
3. Reviewing and comment the Pre-Commissioning Dossiers at the Ready for Commissioning (RFC) stage. Ensuring proper completion of critical outstanding works and punch items; reviewing and comment the Commissioning Dossiers at the Ready for Start-up (RFSU) stage.
4. Supervising of the start-up and early operations of the facilities, until handover to Company Operations.
5. Commissioning of substations 132/33 / 6.6kV, CPF (9 technological lines 50,000 barrels) and well pads (7 platforms, a total capacity of 129 wells). Suppliers of Power Equipment «Hyundai Heavy Industries», «Siemens» and «ABB-Italy».
June 2011 — September 2013
2 years 4 months
LLP «WG PSN». Kashagan field. Offshore.Island «D»,Kazakhstan.
Atyrau
Oil and Gas... Show more
Lead Electrical engineer
1. Management of commissioning team. Supervision of construction and commissioning work execution. Acceptance and hand over documentation execution.
2. Performing risk assessment at the FFU level to identify the specific risks and associated commissioning activities in HV/LV Power Distribution System.
3. Preparation Step by step instructions for Dynamic Commissioning Tests and performance. Checking of the work progress against planning and recommendation any necessary corrective action.
4. Performing of functionality checks to confirm correct operation of all Open, Close, Alarm and Trip functions.
5. Carrying out of load/stability test of transformers and other electrical equipment.
6. Start-up operations of substations on Utility area. Facility handover to the Client.
August 2008 — June 2011
2 years 11 months
LLP “RIG”, Karazhanbas field, Kazakhstan.
Aktau
Power Industry... Show more
Electrical laboratory commissioning and testing lead engineer
1. Supervision of commissioning works at customer facilities.
2. Control of release, installation, commissioning and hand over to operations of manufactured products.
3. Design engineering of transformer substations in accordance with technical specifications; cost estimating using ABS-4 program.
4. Preparation of working plan schedule, organization of commissioning activities on LLP “Тerminalex” Oil-refining facility. Electrical equipment operation arrangement, facilities electrical safety assurance.
5. New facilities commissioning :110/6кV Vostok substation; Gas recovery unit Karazhanbas field, an increase in the capacity of the Rudny Thermal Power Plant by the power unit No. 6 with a capacity of 63 MW.
May 2006 — July 2008
2 years 3 months
LLP “Bolashak Atyrau Limited”, Second Generation Project, Tengiz field, Kazakhstan.
Atyrau
Oil and Gas... Show more
Electrical engineer
1. Pre-commissioning activities in HV/LV Power Distribution System.
2. Adjusting works on launching Power Transformers, 6,3kV Switchgears, 0,4kV Power distribution boards and cubicles relay protection. HV disconnectors and circuit breakers testing.
3. “AS BUILT” department electric networks development and adjustment (SGP plant).
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category BAbout me
1. 20 years extensive experience in various aspects of construction, pre-commissioning, commissioning and for power plants.
2. 20 years of experience as supervisor, engineer, permit to work coordinator and area controller.
3. Knowledgeable in the offshore environment.
4. Technical expertise in inspection, monitoring, isolation, reporting defects and performing operations on various equipment.
5. Appreciation and compliance with job safety standards. Certification in Electrical, Chemical safety and recognition of safety hazards and protection systems.
6. Ability to discover and solve problems within my sphere of expertise.
7. Work well in a team environment and without supervision. Good supervisory skills.
8. Willingness to learn and improve operational, technical and managerial knowledge.
9. Well organized, efficient, quick learner and lots of self-motivation with an excellent background in mathematics and physics.
10. Excellent ability to plan, organize and prioritize work to meet deadlines, very conversant with work permit system.
11. Enjoy being part of challenging projects that stretch my abilities.
12. Good communications skills; flexible and organized, good team player, open minded and ambitious.
Higher education
1997
Higher education
Rudny Industrial University.
Technological process automation, Electrical automation engineer
1992
Higher education
Rudny Industrial College
Mining Electro mechanics, Mining electrician
Languages
Citizenship, travel time to work
Citizenship: Russia
Permission to work: Russia
Desired travel time to work: Doesn't matter