Male, 38 years, born on 16 February 1988

Moscow, willing to relocate, prepared for business trips

Site manager/piping supervisor/construction manager/Mechanical supervisor

Specializations:
  • Other

Employment type: full time, project work/one-time assignment

Work experience 15 years 9 months

April 2024currently
2 years 1 month
IAS Engineering Consulting

Nakhodka, www.ias-engineering.ru/site/

Lead Project Engineer PMC (Head of Construction)
- Consulting the customer on issues of organizing construction by the EPC contractor; - Reviewing and issuing recommendations to the customer on plans and schedules for the execution of work; - Monitoring the progress of the project, identifying risks in project implementation; - Checking and confirming milestones
November 2023April 2024
6 months
Obsky Gas Chemical Plant

Moscow

Construction, Real Estate, Architecture... Show more

Chief specialist
Review and coordination of construction schedules together with the contractor’s resource schedules; - Planning and control of project financing; - Coordination different contractors; - Monitoring the progress of the project, Identifying risks of project implementation; - Audit of applicants for the possibility of being involved in the work.
December 2021April 2023
1 year 5 months

www.ru.airliquide.com/

Chemical Production, Fertilizers... Show more

Site manager
- Management of construction and installation works. From the stage of excavation to the completion of construction and installation works - Meeting targets, and ensuring that crew area productive, pre-planning for following days activities. - Analysis of technical documentation, reading drawings, evaluating the features of the project; - Working with the operating team: resolving disputes, eliminating comments - Work with government regulatory authorities - Budget control
March 2021December 2021
10 months
Novarctic

Murmansk

piping supervisor
Project: EPC, Murmansk, Yamal LNG 2 - control over the manufacture of spools - coordination of material supply and manufacturing in accordance with the priorities and the installation schedule (pre-fabrication stage)) - preparation of daily progress reports - risk management - control of the installation of metal structures of anti-gravity platforms - control of the installation of pipelines for compliance with the project and company standards, the correct installation of shut-off valves (installation stage) - interaction with engineering to solve emerging problems - coordination of system completion and preparation for testing and launch
June 2019April 2021
1 year 11 months

Moscow, www.ru.airliquide.com/

Chemical Production, Fertilizers... Show more

Piping supervisor (Piping Superintendent)
- Management of Air Liquide General contractor STEP : Progress measurement / Mobilization / productivity plan / KPI follow up / monthly billing validation - In charge of elaboration the Inspection plan from French and Russian regulation, and ensuring his appliance - In charge of the full supervision of piping works - Material quality control; (Involved in incoming control, logistic, site inspection and pressure test control - In charge of control and validation of final construction quality documentation for piping as per FR/RU regulation - In direct contact with the Design institute in St Petersburg and Air Liquide, design authority in France. - Learning Air Liquide piping standard especially cryogenic and oxygen application
March 2018June 2019
1 year 4 months

Moscow, www.velesstroy.com

Construction, Real Estate, Architecture... Show more

Welding and Assembling Manager
1. Management of construction and installation works (welding and installation works) at the Amur Gas Processing Plant construction site (total welding volume = 2 million inches; planned construction period is 5 years; customer is Gazprom); 2. Analysis of technical documentation from the general contractor, reading drawings, evaluating the features of the project; 3. Formation of the goals and objectives of the project, development of a concept, obtaining permits for the construction and installation work; 4. Formation and management of staff (up to 1200 people) - selection, motivation, development, formulation and distribution of tasks, monitoring results; 5. Management of the development and implementation of long-term and current construction plans, work schedules; 6. Crisis management, process continuity management at all stages, monitoring compliance with work standards and optimizing the established process. 7.Preparation of weekly and daily reports on the Contractor’s performance; maintenance of statistics on inspections and quality, verification of actual quality reports; Results of work: - Launched automated welding processes. It was possible to eliminate the backlog of construction and installation works; - Procedures for the transfer of executive documentation were developed, a process for confirming the work performed was organized.
October 2016March 2018
1 year 6 months
Velesstroy

Sabetta (Yamalo-Nenets Autonomous Area), www.velesstroy.com

Construction, Real Estate, Architecture... Show more

Deputy construction area manager
Client: PJSC NOVATEK-YAMAL LNG. General Contractor: South Tambey LNG. 1. Installation of industrial pipelines of any degree of complexity and diameter (as well as steel structures of any complexity and height) and installation of compressor and turbine equipment (total welding volume = 300 thousand inches; block implementation system); 2. Quality control of welding and assembly processes in accordance with GOST and ASME 3. Supporting and execution of putting the facility into operation, construction, installation and commissioning in line with all qualitative and quantitative target parameters. 4. Arranging construction and installation works. 5. Ensuring that the process sequence of installation works is followed on site. 6. Keeping records of works performed. 7. Taking part in commissioning and start-up. 8. Safety supervision and taking measures for eliminating the defects, violation of workplace hygiene, compliance with labor safety instructions personnel. 9. Supervision of labor and tradesmen complying with industrial and labor discipline regulations 10.Preparation of weekly and daily reports on the Contractor’s performance; maintenance of statistics on inspections and quality, verification of actual quality reports; Results of work: - Commissioning turnkey projects to the general contractor (South Tambey LNG) and the commissioning contractor of turbine and compressor equipment (General Electric Oil & Gas), signing off respective Test Packs, SIs, TQs, RFIs and other documents.; - The project was completed ahead of schedule.
March 2015October 2016
1 year 8 months

www.velesstroy.com

Construction, Real Estate, Architecture... Show more

Piping Superintendent/ Head Foreman
1. Organization, planning, management of welding and installation works at the unique construction site main pump station and automatic diesel power station (in the Arctic Circle), at the construction site of the LODS Krotovka, as well as at the LODS Samara (reconstruction) - Customer: Transneft; 2. There are about 200 men under my authority - selection, motivation, development, formulation and distribution of tasks, monitoring results; 3. Development and implementation of an anti-crisis strategy, building effective production and construction procedures; 4. Development of construction schedules. Coordination of the testing program for technological pipelines and pipelines of engineering networks (including main and auxiliary piping lines of main pumps and compressor) 5. Conducting a set of works on testing, flushing, etching pipelines. Results of work: - An anti-crisis program has been developed and implemented, production and construction work have been formed and regulated; - A strong productive team has been formed; - Project Main pump station and automatic diesel power station: the construction was completed ahead of schedule by 3 months; - Project LODS Krotovka: the project was completed in a short time (6 months); - Project LODS Samara (reconstruction): The project was completed as planned
February 2012October 2014
2 years 9 months

Moscow, www.velesstroy.com

Construction, Real Estate, Architecture... Show more

Senior Engineer of welding section in planning and technical department
Analysis of project documentation and making corrects with their subsequent coordination at the design institute of Giprotruboprovod OJSC; 2. Calculation of the scope of work of the welding and installation site at construction sites; 3. Monitoring and coordination of the interaction of welding and assembly sections in separate divisions: OPS-11 (oil pumping station), OPS -15, OPS -19, LODS “Southern Balyk” (the line operation despatcher station), OPS -34, OPS -36, OPS -41, LODS Cherkasy, Samara district oil department, Grushovaya, CPC Pipeline System OPS -6, OPS -7, OPS -8, Antipinsky Refinery; 4. Scheduling work and determining the need for welding equipment and materials; 5. Accounting for work performed at construction sites. Results of work: - A system of task setting of work was developed, which allowed to accelerate the processes of construction and installation work; - A piece-rate wage system was developed and introduced, which increased the productivity of workers by 25-37% and allowed to reduce accommodation costs; - Implementation of construction projects (as a head foreman) at such facilities as: “Southern Balyk LODS”, OPS -15, OPS -19, the linear part of the Kuyumba-Tayshet pipeline 95 km was ensured
October 2009February 2012
2 years 5 months

www.velesstroy.com

Construction, Real Estate, Architecture... Show more

Foreman
1. Managing and monitoring of welding and erection of a trunk pipeline pump station, a fire extinguishing pump station. Erection of a pipeline swab launcher-reciever, installation of a water supply pipelines. Manufacture and erection metal structures, hydro test; 2. Business correspondence; 3. There are about 30 men under my authority; 4. Managing of preparation and conduct of welding and erection work from the beginning till commissioning.

Skills

Skill proficiency levels
Management of production personnel
Project management
Normative technical documentation
AutoCAD
Construction
Organizational skills
Construction Management
NAKS
Norstroy

About me

Experience in design and construction in leadership positions. Expertise in the field of welding and installation works and construction control. Experience in managing the work of the department with a staff of up to 1,200 people. Experience in team building, alignment of work processes in accordance with legislation and business requirements Control over the design, authorization, contractual documents. Experience in developing a project development strategy based on business tasks. Knowledge of construction technologies, GOSTs, budgeting, accounting, construction equipment, pricing in construction. Free reading drawings. Understanding the intricacies and nuances of the economics of construction. Experience in the successful implementation of projects for the construction of significant oil and gas facilities. Management of communications with customers, design institutes, contractors, suppliers I have NAKS certification Norstroy

Higher education (master)

2010
Higher education (master)
Don State Technical University, Rostov-on-Donu
Faculty of Mechanical Engineering, Mechanization and automation of welding production

Languages

Russian — Native

English — B2 — Upper Intermediate

Citizenship, travel time to work

Citizenship: Russia

Permission to work: Russia

Desired travel time to work: Doesn't matter