Больше информации по резюме будет доступно после регистрации

Зарегистрироваться

Male, 47 years, born on 28 March 1979

Moscow, willing to relocate, not prepared for business trips

Construction Planner

Specializations:
  • Other

Employment type: full time, project work/one-time assignment

Work experience 28 years 8 months

April 2017currently
9 years 1 month
Fluor
Construction Planner
Construction Planner/Scheduler - Workface planning in development of painting and insulation work packs for final installation post testing work. Tracked progress and monitor against overall project construction schedule to handover. Assisted with other scheduling responsibilities and needed during demob process. ;
November 2016March 2017
5 months
Fluor/Exxon Mobil
Construction Planner
Hydrocracker Expansion Project, Construction Planner/Scheduler -Developed/flushed out piping/mechanical work with construction and contractors. rebaselined existing schedule. Updated priorities in fabrication schedule to interface with the construction driven schedule. Daily interfacing with construction. Streamlined 90day lookahead weekly meetings. ;
December 2012October 2016
3 years 11 months
Fluor/Exxon Mobil (ENL)
Lead Shutdown Scheduler, Sr Construction Planner/Scheduler
Lead Shutdown Scheduler -Multiple facility (5) outage. Coordinated with 3 other contractor schedulers in building, maintaining integrated schedule through this facilities for a full field 21 day outage. Reviewing of planned work provided by local inexperienced planners and mentorship during this process. * Exxon Mobil, Sakhalin Island RUSSIA - EPCC Sr Planner/Scheduler - Managed, Created, Maintained all aspects of eng, procurement, fab, construction, & commissioning schedules for small caps projects group. Routinely participated in constructability review with engineering, all levels of gates reviews, and checkpoints. Developed manpower plans against construction schedules. Participated in daily construction meetings to monitor schedule and critical path as executed is ongoing in the field. ; * Exxon Mobil, Orlan Gas Platform, 3 Well Expansion Project, Sakhalin Island, RUSSIA-Sr Construction Planner/Scheduler - 1st of its kind project with Exxon to install 3 new wells on existing platform by coring through GBS of structure, including the installation of additional flowlines and related E&I. Assumed control of construction schedule as project as behind; rebaselined,and turned more focus to the critical path activities that were not well highlighted. Scheduling for multiple contractors, fab shop work and material deliverables. ;
June 2010December 2012
2 years 7 months
Ch2m Hill
Sr Shutdown Planner
* SEIC (Shell) Liquefied Natural Gas facility (LNG), Sakhalin Island, RUSSIA-Sr Shutdown Planner/Scheduler - Built and maintained shutdown schedule for LTPI SD in 2010,and HGPI shutdown in 2011 & 2012 along with additional LTPI shutdowns for 5 GTGs onsite. Tracked emergent work and integrated into schedule for monitoring of effect on critical path. Planned work for all shutdowns and coordinated with numerous contractors during SD. Trained/mentored local Russian counterpart to take over my role as shutdown scheduler. ;
October 2009June 2010
9 months
G-Force Engineering
Planner
* Adv LIGO Project, Richland, WA - Project Controls/Planner/Scheduler - Installation planning for revamp of existing interferometers in both Richland, WA and Livingston, LA. Creating new level 2 summary schedule, to detailed resource loaded level 4. Coordination with relevant team leads between both sites, CIT, and MIT. Development of staffing plans, and creation of organizational charts. Creation and management of cost/schedule change orders to baseline schedule. ;
March 2008May 2009
1 year 3 months
Fluor
Construction Sr Planner
* TANECO, Tatarstan, RUSSIA - Construction Sr Planner/Scheduler - $7.5 Billion grassroots 185,000 Barrel per day Oil Refinery - Responsible for planning out new construction work in various units to include Crude and Vacuum Distillation Units, SRUs, SWS, WWT, Flares, & other Utilities. Created and maintained various unit construction schedules. Worked to create & maintain master job schedule for site, including commissioning & startup activities. Lead and coordinated this schedule integration with construction & engineering schedulers. ;
February 2007March 2008
1 year 2 months
Water Systems
Construction Planner
NA Water Systems (Veolia) US Virgin Islands - Construction Planner/Scheduler - NAWS is EPC company with the contract for construction of new Advanced Waste Water Treatment plant & revamp of existing plant. I maintained/modified master project schedule for the job, including creating recovery schedule. Coordinated with subcontractors on meeting schedule deadlines. Weekly and monthly schedule reports made to client. Maintained field progress monitoring system with S-curves. Worked with engineering on developing tie-in and startup plan. ;
July 2006February 2007
8 months
Chicago Bridge & Iron
Cost Control Engineer - Developing Budgets
Think Energy Resources * MOTIVA Refinery, Norco, LA - Cost Control Engineer - Developing Budgets & cost projection for Low NOx Projects. Combined total cost of $55m. Establish/maintaining project cost reports and forecasts. Tracking of field change orders. Enter WOs, PRs, & POs as required. Approve, validate, and/or audit invoices. Prepare monthly CAPEX, and Cash flow forecast. As required, prepare accrual information. Perform high level validation of the original AFE estimate. Verify accuracy and completeness of proposal packages, & assist in bid tabulation. Prepare reports for project management. ;
July 2005July 2006
1 year 1 month
Chicago Bridge & Iron
Scheduler
* VALERO Refinery, Houston, TX - Project Controls/Scheduler - Replacement Construction Planner/Scheduler for construction project of ULSD unit. CB&I general contractor on job. Maintained schedule, Pre-paired recovery schedule to recover from performance losses over job. Prepare variation analysis, including trends and changes. Maintained work scope tracking log, to track piping, equipment & subcontractor progress. Reports to client in weekly meetings on CB&I and subcontractor schedule attainment, progress and deliverables. ; * MOTIVA Refinery, Port Arthur, TX - Project Controls - Project Controls Lead for FCCU 140,000MH Turnaround, total cost $21m. CB&I general contractor on job. Cost controls, Developing cost projection for T/A and tracking cost throughout. Reporting to Client and CB&I on cost progress. Invoicing of client based off of contract. Tracking of field change orders and estimating costs of FCO's and impact to T/A cost. Maintained planned vs. actual report and worked with scheduler on earned vs. actual report. ;
July 2004July 2005
1 year 1 month
HOVENSA
Maintenance Planner
* HOVENSA (world class merchant refinery with Crude capacity of 495,000 barrels per day), St. Croix, US Virgin Islands - Went direct hire with Hovensa as Maintenance Planner/Scheduler - Responsible for 4 SRUs, 4 SWSs, 2 Beavon Units, Purge Treatment Unit, 3 API Separators, 2 Neshaps Strippers, Waste Water Treatment plant, and all flares on site. Duties in both Sulfur & Waste Water zones included, estimating of work, defining materials needed to perform work and building of scaffolds and insulation removed as needed. Material procurement (Ordering material from warehouse or off island purchases. Scheduling of jobs with operations on availability of material and maintenance manpower. Scheduling of rigs or other heavy equipment, and coordination with third party contractors in order to perform work in a timely manner as to not break schedule. Reading engineering drawings & performing take offs ;
August 2002August 2004
2 years 1 month
Turner Industries/HOVENSA
Maintenance Planner
(world class merchant refinery with Crude capacity of 495,000 barrels per day), St. Croix, US Virgin Islands - Maintenance Planner/Scheduler- In charge of planning work for new Delayed Coking unit put online August of 2002 (capable of 58,000 B/D output) and the planning of work in 4 SRUs, 4 SWSs, 2 Beavon Units, and all flares on site. Duties in both Coker and Sulfur zones included, estimating of work, defining materials needed to perform work and building of scaffolds and insulation removed as needed. Material procurement (Ordering material from warehouse or off island purchases. Scheduling of jobs with operations on availability of material and maintenance manpower. Scheduling of rigs or other heavy equipment, and coordination with third party contractors in order to perform work in a timely manner as to not break schedule. ;
March 2001August 2002
1 year 6 months
Turner Industries
Commissioning/Maintenance Planner
Turner Industries * BASF/FINA Ethylene Facility, Port Arthur, TX - Commissioning/Maintenance Planner/Scheduler - Assisted in commissioning planning and start-up scheduling of facility and eventual transition into maintenance including cost controls and project work. Assisted in the planning/scheduling of two turnarounds proceeding and following start-up due to the unforeseen problems the new facility experienced. ;
May 1997March 2001
3 years 11 months
Turner Industries
Foreman
* Ineos Acrylics Turnaround, Beaumont, TX - Boilermaker ; * Dupont Sabine River Works Ethylene Unit Turnaround, Orange, TX - Boilermaker ; * Beaumont Methanol Turnaround, Beaumont, TX - Boilermaker ; * Valero Refinery Turnaround, Texas City, TX - Expeditor ; * US Intec Turnaround, Port Arthur, TX - Pipe Fitter Helper ; * Dupont Sabine River Works - Project Work, Orange TX - Pipe Fitter Helper ; * Air Liquide Turnaround, Channel View, TX - Pipe Fitter Helper ; * ECI Carbon Black Turnaround, Orange, TX - Pipe Fitter Helper ; * Air Liquide- New Construction, Nederland, TX - Pipe Fitter Helper ;

Skills

Skill proficiency levels
SAP
Primavera
Team management
Teambuilding
Английский язык
MS Visio
SAP Project
Экономический анализ
SAP CRM
SAP R/3
MS PowerPoint
Управление бюджетом

About me

development of painting and insulation work, Procurement, LNG, Responsible for planning, scheduling of facility and eventual transition, Audit, Forecasting, Invoicing > Issuing Invoices, variation analysis, Capital Expenditures, Accruals, Cash Flow Analysis, Excellent communication skills, Industrial Planning, Maintenance Planning/Scheduling, Turnaround Planning/Scheduling, Microsoft Excel, Microsoft Office, Microsoft Outlook, Microsoft Word, HOVENSA, JDEdwards Suite, Microsoft Access, Microsoft PowerPoint, Microsoft Visio, Primavera P3, SAP, SAP R/3, SAP V3.0, SAP V4.6

Higher education

1997
Higher education
Nederland High School
High School

Languages

English — Native

Russian — A1 — Basic

Citizenship, travel time to work

Citizenship: USA

Permission to work: Russia

Desired travel time to work: Doesn't matter