Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was more than two weeks ago

Male, 44 years, born on 20 August 1981

Yuzhno-Sakhalinsk, willing to relocate, prepared for business trips

Supervisor / Superintendent (lifting & rigging, heavy lift, equipment, steel structure)

Specializations:
  • Other

Employment type: full time, project work/one-time assignment

Work experience 21 year 8 months

October 2018currently
7 years 8 months
Petrofac Facility Management Limited (Project managing company)

www.petrofac.com

Lifting/Rigging Superintendent (Heavy lift specialist)
Construction of Sakhalin-2 OPF Lunskoe Booster Pump Station - Coordination and control of on-site lifting operations (cargoes and equipment of various complexity (compressors, turbines, horizontal and vertical tanks, inlet separators, flare, waste heat recovery unit, air and oil cooler units and other equipment)); - Selection of hoisting equipment for cargo lifting of various complexity; - Coordination of simultaneous operations with several lifting machines for lifting and turning (tilting) of cargoes and equipment of various complexity; - Review and approval of work-related documents (progress schedule, WMS, Lifting operations using hoisting machinery, technical flowcharts, procedures, inspection and testing plans, permits to work); - Control over planning of installation of process equipment (preparatory work, timely availability of work-related documents for execution of works, availability of equipment at the site, personnel qualification); - Supervision of contractors on safe installation, operation and maintenance practices and preservation/storage of lifting equipment and machinery, in accordance with Russian safety regulations as well as corporate procedures and company standards; - Conducting briefings on the safe use of lifting equipment; - Carrying out inspections and audits of the lifting equipment; - Initiating meetings to discuss and plan lifting operations with contractors and subcontractors; - Participate in SEIC's Goal Zero and Petrofac's Horizon Zero safety programs;
September 2016October 2018
2 years 2 months
South Tambey LNG (Project managing company)

Construction, Real Estate, Architecture... Show more

Static Eqiupment Supervisor
Supervision of: - static and rotating equipment installation by Subcontractors: Vessels, Bullets, Separators, Generators, Modules, Fixed Roof Tanks - Installation and inspection of bridge cranes (STAHL, 50 t.) according to the vendor documentation. Carrying a load test for static and dynamics. - Miscellaneous structural steel installation (Flare derricks, pipe racks etc.), - Installation of BOG (Boil off Gas) compressor equipment skids (motor, gear box, LP compressor, HP compressor) as per project documentation. - Installation of dry gas seals, bearings and other elements for starting HP (high pressure) and LP (low pressure) compressors according to Vendor documentation (SIEMENS). - Shaft alignment of equipment using a laser device "Rotaling Ultra" (Compressor train: motor - GB (gear box) - LP compressor - HP compressor). - Tightening of bolted and flanged connections (equipment, inlet and outlet pipes). - Area surface preparation for static equipment installation: Access ways, foundations, pilecaps. Coordination of any types of working activities with contractor and subcontractors for timely and safe completion. PTW (permits to work) reviewing, endorsing, authorizing and signing. Verification of lifting plans for safe installation of equipment in the design position. Everyday site inspections to ensure that works are being done in a strict accordance with Project Design, PTW (permits to work) and Company’s Safety Rules and Regulations. Ensuring site operatives are aware of risks and hazards.
June 2014July 2016
2 years 2 months
“Chevron Neftegaz Inc.” (Project managing company)

www.cpc.ru

Construction, Real Estate, Architecture... Show more

Construction Representative
Reviewing and approval of the work-permits. Organization and coordination of works with contractor’s representatives. Close cooperation with contractors to ensure efficient and safe coordination of simultaneous operations (SIMOPS). Ensuring compliance with special work procedures (civil, mechanical, painting, welding, and coating). Reviewing and approval of the Lifting plans for installation equipment’s and structures. Ensuring that all rotation and static equipment is installed in strict accordance with Project requirements (valves, pumps, vessels, generators etc.) in safest way and timely manner. Participating in inspections, signing check sheets as per Inspection and Test Plans (ITP). Ensuring quality of works performed by contractors and subcontractors. Review and signing related documentation.
June 2013June 2014
1 year 1 month
“Chevron Neftegaz Inc.” (Project managing company)

www.cpc.ru

Construction, Real Estate, Architecture... Show more

Piping and Mechanical Supervisor.
CPC (Caspian Pipeline Consortium) expansion Tank Farm project: Monitoring and supervising all stages of subcontractors’ works related to equipment installation, process piping of 100 000 m3 tanks; ensuring that works are completed as per work plan. Ensuring safety compliance of contractors and subcontractors. Ensuring that completed works comply with design documentation and standards (participating in inspection commissions for receiving inspection of materials and equipment, inspecting work stages). Ensuring compliance with work-permits. Attending meetings with contractors and subcontractors. Making daily reports. Making all required documentation as per company procedures.
October 2008June 2013
4 years 9 months
JSC "Orensakh"

orensakh.ru

Construction, Real Estate, Architecture... Show more

Construction Supervisor / Construction Superintendent
Maintenance and modification of primary oil refining plant and administrative buildings at the SBP "Odoptu" within the project "Sakhalin - 1" (project title: Maintenance Supervisor): Organization and management of the production process and its control. Maintain required documentation. Conducting negotiations with the customer. A prompt solving of issues. Preparation and issue the permits in the electronic system EPTW ENL, as work on the electronic system at work tasks SAP (IPES). Repair works at the pipeline "Odoptu-Chayvo" in Piltun bay and onshore within the project "Sakhalin - 1" (project title: Construction Superintendent): Organization and management of the production process and its control. Negotiation and communication with contractors. Maintain required documentation. Opening the pipeline under pressure. Laying the pipeline in the current project position with well pumps. Ballast piping. Sakhalin-1 Project Arkutun-Dagi Produced water injection pipeline construction (project title: Construction Superintendent, 2010- up to current date): Double joint pipe stringing at ROW. Trenching, trench bottom preparation, pipe lowering-in and pipeline backfilling. Soil excavation above and underneath live oil and gas pipelines for pipeline crossing with live pipelines and utilities. Live pipeline heavy haul crossing arrangement. Lifting operations. ROW soil reclamation. Sakhalin-1 Project Odoptu North Well Site Initial Water Separation Unit Construction (project title: Rigging Supervisor, 2009-2010): Module assembling. Different level complexity structural steel installation. Different OD Process pipeline flange connection installation. Vessels (volume up to 50m3), generators, pumps, valves and block valves installation. Installation of modules and piperacks of different length (10-25 meters). Different level complexity lifting operations (MAXIMUM WEIGHT -137 TONS). Lifting plan development. Sakhalin-1 Project Pipeline OPF Chayvo-NWS Odoptu Construction (project title: Pipeline Supervisor, 2008-2009): ROW preparation. Oil pipeline ROW pipe stringing. Trenching, trench bottom preparation, pipe lowering-in, erosion control blanket arrangement, pipeline backfilling. Oil pipeline crossing arrangement. Informative sign installation at ROW. Technical reclamation. Water crossing 10 km in length (Piltun Bay).
September 2004September 2008
4 years 1 month
CJCS "LeasingStroyMash" Sakhalin branch

www.lsmgroup.ru

Construction, Real Estate, Architecture... Show more

Construction Supervisor
Sakhalin-2 Oil and Gas Pipeline construction: Building and facility construction. (Canadian Module, frame-filling buildings, skid buildings, etc.) ROW preparation. Trenching, trench bottom preparation, erosion control blanket arrangement, pipeline backfilling. ROW and temporary access road construction, repair and maintenance. Construction of pipeline crossing with uncategorized unpaved roads. Erosion control. Biological and technical reclamation. Stone quarry operations for rock digging, gravel production (grinding-sorting facility)

Skills

Skill proficiency levels
Responsibility
Communication skills
Multitasking
Organization Skills
Negotiation skills
Leadership Skills
Teamleading
Team management

Driving experience

Own car

Driver's license category B

About me

Qualification certificate: Protocol RTN № 77-19-247 from 04 April 2019 Certification categories: A1. Protocol RTN № 77-19-632 from 23 September 2019 Certification categories: Б9.31. Protocol RTN № 77-19-839 from 19 December 2019 Certification categories: Б2.13. Protocol RTN № 77-20-11 from 20 February 2020 Certification categories: Б2.1; Б9.32. Certificate № 1363-1 from 20 July 2020 - Work at Height (3-th level). PC skills – User. (AutoCAD. Microsoft Word, Microsoft Excel, Internet Explorer)

Higher education

2007
Higher education

Languages

Russian — Native

English — B1 — Intermediate

Citizenship, travel time to work

Citizenship: Russia

Permission to work: Russia

Desired travel time to work: Doesn't matter