Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
The photo has been hidden by the job seeker
Was more than two weeks ago
The full name has been hidden by the job seeker

Male, 53 years, born on 10 August 1972

Moscow, willing to relocate, prepared for business trips

The photo has been hidden by the job seeker

Project-Construction Manager/Superintendent/Quality Lead

15 000 $ in hand

Specializations:
  • Production engineer, quantity surveyor

Employment type: full time, part time, project work/one-time assignment, work placement

Work experience 16 years 6 months

December 2019currently
6 years 6 months
The employers have been hidden by the job seeker

Construction, Real Estate, Architecture... Show more

Project-Construction Manager
Duties and Responsibilities:  Plans, reviews and administers construction and erection activities in the site to optimize resources and minimize cost;  Plans and allocates appropriate manpower, tools, equipment and resources for various project activities.  Ensures the construction/erection works are compliance to design, specification and standard quality.  Keeps track of project schedule, productivity/progress and project budget; ensures construction/erection deliverables are met based on approved project schedule and budget.  Coordinates with other sections in Operations to make sure problems encountered are solved in time.  Assists in the review of construction/erection procedures and work instructions to improve operating quality and efficiency of processes in accordance to quality management system requirements.  Assists Business Development in accomplishing the questionnaires and checklist of the prospective customers during the Pre-Award stage and provides bid documents as requested.  Reports regularly to the Project Director or the Project Manager the progress performance in the assigned area/site.  Performs other duties that may be assigned from time to time.
January 2019December 2019
1 year
The employers have been hidden by the job seeker

Oil and Gas... Show more

Construction Manager
Report to : Lead Project Manager Rody Nasr Tel: +971 2 497 9196 Cell:+971 54 7917052 Email: ronasr@enerflex.com Project : Appointed as Construction manager on Block 62 Oman Depletion Project and based at Construction Site, I am responsible for the Construction, Project Quality, Planning, Schedule, Document Review, Budget, and generating Method statements, Lifting Plans and Managing of staff and Sub-Contractors. Gas Compression, Booster and Power generation plant construction, Block 62 - OXY/Sadad - PDO Scope of work: * Booster Compressor system installation and commissioning * IA Skid installation and commissioning * Condensate Filtration and Collection System and commissioning * Schedule planning and progress updates * Weekly and monthly meeting and Reporting to Client * Review Daily, Weekly and Monthly reports from contractors * Site and Camp maintenance and management * Interface meetings with Project and Operations * MEI Walk Downs * PSSR and Commissioning interface * Project Handover, Commissioning and Start-up support Reason leaving : Currently employed SASOL South Africa
January 2018January 2019
1 year 1 month
The employers have been hidden by the job seeker
Construction Manager
Report to : Lead Project Manager Ricardo Blignaut Small Single Discipline Projects Department, Group Technology, a division of Sasol South Africa (Pty) +27 72 655 0831 Ricardo.Blignaut@Sasol.com Project : Appointed as Construction manager and based at Site office, I am responsible for the Construction Management and part of the team lead by Project Manager allocated to a Project where I am overseeing the Project Quality, Planning, Schedule, Document Review and generating Method statements, Lifting Plans and Managing of staff and Sub-Contractors on Water treatment plant, Refurbishing of Saltwater system and New Salt Pit construction (Civil, Piping and Mechanical). Oxygen Plant, Air and Oxygen Condenser refurbishment. Gas Generation Plant, New Transformer HV/LV System upgrade. Steam Generation Plant, Fire System replacement and System upgrade. . Scope of work: * Review Schedule and Planning * Contractor selection and Man-Power Planning * Contractor Vessel and Tank fabrication facility inspection * Progress meetings (Client and Contractor) * Management Meetings * System Handovers Reason leaving : Project Completion Pearl 2018 Turn Around
January 2018January 2018
1 month
The employers have been hidden by the job seeker
Quality Lead
Position : Block Lead Report to : Project Manager/ Anton Kennard Anton.kennard@shell.com +974 6629 2568 Appointed as FGP(Field Gas Plant) Block Lead and based in Site office. I am responsible for Project Quality, Planning, Schedule, Document Review and generating Method statements, Lifting Plans and Managing of staff and Sub-Contractors. Scope of work: * Schedule Planning * Man-Power Planning * Equipment Planning * Coordinating with Client * Staff Interviews * Day Shift/Night Shift planning and handovers * Progress meetings (Client) * Management Meetings * Scrubber Cleaning (Hydro Jetting), Exchangers- (Bundle removal, replacement and inspection), Vessel (Inspections and cleaning), Instrument(Transmitters, Control Valves replacements and inspections) * Blanking of systems (Safe making) * Piping installations and Welding inspection, removing, replacing, upgrading of existing pipelines in the plant. * Hydrotesting * Box-ups and re-in statements (Painting, Heat tracing, Insolation, Cladding) * System Handovers Reason leaving : Shut Down completed
January 2016January 2017
1 year 1 month
The employers have been hidden by the job seeker
Quality Lead
Report to : Project Quality Manager/ Pieter Erasmus Pieter.Erasmus@WorleyParsons.com Appointed as Quality Lead and based in Client Site office. I am responsible for Project Quality, Document Reviews and Project/Quality documents submitted by contractor for review and Consolidation. Scope of work: * Review Specifications, Procedures, Method Statements, Inspection Tests Plans (ITP) and Risk assessments, NCR's, RFI's and DVR's, WPS and WPQR Reviews and approvals * Site Visits/Vessel Fabrication Shop inspections, Welding/ Coating/ Civil Inspections on Metering Stations, Compressor Stations, Pigging Stations, BVS and Main Line activities, Golden Welds and Mainline Tie-Ins * Daily, weekly and monthly Quality Reports * Weekly quality review meeting with contractors. * Weekly construction meeting with delivery Manager and contractors. * Daily morning coordination meetings with site quality inspectors. * Document control correspondence to ensure all updated documents and registers are maintained, updated and issued to contractor as latest revisions. * Internal and external audits Reason leaving : Project completed
January 2015June 2016
1 year 6 months
The employers have been hidden by the job seeker
Construction Manager
Power Generation Modules Report to : Project Manager/Kaisa Marton kaisa.marton_external@wartsila.com Responsible for the construction completion in Batam Indonesia, Power Module to Exhaust Stack Integration in Singapore Scope of work: * Fabrication of Power Plant Modules A and B with two Wartsila 18m/watt Motors, * Loop oil systems, Process and Utility Tie-Ins * WHRU Waste Heat Recovery Units * Boiler assembly and installation * Steam System fabrication and installation * Storage tanks Fabrication and installation * Managing contractors and schedule on site. * Structural Erection, Boiler and Steam Drum installation, Piping installation, welding, welding inspection, Coating inspections. * Schedule Management and Progress report Reason leaving : Project Completed
January 2014January 2015
1 year 1 month
The employers have been hidden by the job seeker
Mechanical Lead
Report to : Construction Manager/ Oswald Tonkin OswaldT2@bwenergyservices.com Responsible for the construction completion on the Nylon Conversion Plant, MC and Pre Start up Mods and Tie-Ins. Commissioning and Start Up. Scope of work: * Managing contractors and site schedule * Structural erection and pre startup and Process Tie-In Modifications * Piping, Structure and Vessel installation and Inspections (Process and utility's) * Welding inspections, WPS/WPQT and Welder Qualifications * Coating inspections, DFTS/WFTS, Application reviews. * Civil Work and Inspections on drains and cable trenches * Schedule Management and Progress report * Vendor coordination for site visits and Startup Reason leaving : Project Completed
January 2014January 2014
1 month
The employers have been hidden by the job seeker
Construction/Quality Supervisor
Report to : Construction Manager/ Hennie Venter hennie.venter@amec.com Scope of Work: Power Generation, Tanks, Civil, Structural, Mechanical and Piping Responsible for the construction and erection of the Iron Ore Plant in Liberia West Africa, managing contractors and schedule on site. Scope: Structural erection; Piping installation, Welding/Welding inspection; Coating inspections. Schedule Management and Progress report * CAT Power Generation Plant - Civil work and inspection Generator and Diesel powered engine installation * ThyssenKrupp Stackers and Re-claimers- Civil work on Rails, Installation and Inspections * Sag Mill Civil work on base and installation of equipment * Crushers- Civil work on mill base and equipment installation by Vendor and inspections * Conveyers- Civil works, Conveyer installation and inspection * Structural Steel installation, Welding Inspection, cladding and Inspection * Mass Storage tank fabrication * Quality interfaces with Construction teams preparing ITP's, inspection methods and acceptance criteria. Reason leaving : EBOLA outbreak (State of Emergency)
September 2012December 2013
1 year 4 months
The employers have been hidden by the job seeker
Construction Supervisor
Report to : Construction Manager/ Responsible for the construction of the biggest Floating Wet Concentration Dredge Plant in Africa. Plant consists of five floating sections including Dredge Plant, Surge Bin Module with a 65 Ton Holding capacity, Spiral plant to separate five minerals threw Roughers, meddler's, Cleaners and samplers. Densifiers plant- 65 Ton Surge Bin, Cyclones and process pumps. Stacker- Spreading Spills on to the shore back filling pond as process moves forward. Scope: * Managing contractors and schedules on site * Pontoon installation- Total of 56 Pontoons assembled on site, aligned and welded to form base of Module structures * Surge Bin Tank assembly- Two off 65-ton capacity surge bin fabrication and installation, Piping and circulation Pumps * Structural erection- 2500 Ton Steel structure * Spiral Module. 110 Spiral units assembled and installed 33m high with piping and circulation systems * Coating inspections- Marine Grade Painting Systems Reason leaving : Project completed. (Reference attached)
January 2009September 2012
3 years 9 months
The employers have been hidden by the job seeker
Quality Lead
After: Tank Package Engineer & QC coordinator - Welding / Coating / Cavils (Pipeline, Pump stations and Valve Stations) Client: Transnet Capital Projects.

Skills

Skill proficiency levels
Работоспособность

About me

Power Generation, the Construction, Managing of staff and Sub, Water Treatment, Refurbishment, the Construction Management, Construction site, Contractor selection, Installation and Commissioning, Camp maintenance and management, Project Quality, Welding, Equipment Planning, the construction completion, installation, Vendor coordination, Generators, Civil Engineering, Structural Steel, Construction Management, Quality Management, maintenance, Microsoft Schedule, Document Control

Higher education

2010
Higher education
Corrosion Institute of Southern Africa

Languages

Russian — Native

Citizenship, travel time to work

Citizenship: Russia

Permission to work: Russia

Desired travel time to work: Doesn't matter