Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas yesterday at 18:53
Male, 53 years, born on 15 January 1973
Moscow, willing to relocate, prepared for business trips
Electrical Lead Engineer
Specializations:
- Power engineer, electrical engineer
Employment type: full time, part time, project work/one-time assignment
Work experience 27 years 2 months
December 2021 — currently
4 years 5 months
JSC IGHolding RUS
Moscow
TPL / Electrical Lead Engineer
1. Refurbishment of Automatic Fire-Fighting system at Toktogul HPP (4x300MW), Kyrgyzstan
- System detailed design follow-up & coordination with the Client (GE Renewable)
- System site installation supervision
- Leader of System site commissioning activities
2. Technical tendering works:
- Misc. site surveys
- Technical specifications and notes for Offers
- Technical support for tendering
3. Detailed design of mechanical systems control panels.
4. Installation and supervision of electrical systems installation.
5. Refurbishment of electrical equipment for Georgia Railway cranes
6. Consultant and technical support for Krasnoyarsk HPP refurbishment works (BOP EL)
7. Refurbishment of getes lifting mechanism at Inguri HPP, Georgia.
June 2021 — November 2021
6 months
GE Renewable (France), Grenoble
BOP Site Supervisor (Electrical)
Refurbishment of Toktogul HPP (4x300MW), Kyrgyzstan (HPP site location)
HPP Elec BoP (Auxiliary) equipment installation Supervisor. Main activities:
- Supervision for installation of Auxiliary Electrical equipment (control/ protection/power panels, cable trays, cable
routings/laying, grounding system, cable dressing, wiring connection, etc.)
- Verification of wires' connection correctness.
- Site engineering.
January 2021 — June 2021
6 months
BALTIC SGEM, Moscow, Russia
BOP Electrical leader
Sheksna HPP (4x20MW), Russia
General overhaul of 2 horizontal bulb units, including auxiliary equipment. General overhaul of 110kV switchyard equipment.
Main activities:
1. Site survey and preparation of site-survey report, including description of works to be done.
2. Coordination of sub-contractors' activities (electrical Lab, BoP electrical design sub-contractor, civil works sub-contractor).
3. Coordination with Client scope of Design (Stage "PD" – Project Documentation).
January 2019 — December 2020
2 years
GE Renewable (Switzerland), Birr
BOP Site Supervisor (E&M)
Refurbishment of At-Bashi HPP (4x10MW), Kyrgyzstan (HPP site location)
- Supervision of erection activities dedicated to Electrical & Mechanical Plant BOP equipment (MV/LV/DC distribution,
cabling, GSUT 110/10kV, Drainage & Dewatering systems).
- M&E Plant BOP site design activities.
- Adaptation of Project Office design vs local site conditions (technical support of Project Office)
- Site Manager deputy activities
- Site Camp erection supervision
April 2016 — December 2018
2 years 9 months
SIBUR group – Engineering Institute “NIPIgaz”
Electrical Lead Engineer / Expert on inspections and technical audits
Amur Gas Process Plant turn-key EPC Contractor
- Inspections and technical audits of suppliers and manufacturers of electrical equipment supplied for the plant;
- Participation at Factory Acceptance Tests and Final Inspections of equipment.
- Verification of documents from Sub-Contractors & vendors to be in line with Russian Norms & Standards;
- Coordination of engineering & documents between Sub-Contractors and the Owner (РАО Gazprom);
- Change-order management;
- Miscellaneous technical support
January 2012 — April 2016
4 years 4 months
LLC Alstom HYDRO-RUSSIA
Electrical MV/LV Principal Engineer
Preparation of technical Section of Tender offers for Sendje HPP (4x50MW, Equatorial Guinea, new construction), Upper-Tulomskaya
HPP (4x67MW, Russia, reconstruction).
Kubansky HPPs Cascade:
Full reconstruction of 8 Cascade HPPs and 1 PSP. Total power 462MW:
- Preparation and approval of technical tasks for subcontractors of 110/330kV GIS design;
- Tracking of design from subcontractors
- General technical solutions for design of electrical equipment: GIS-110/330kV; HV/MV/LV switchgears; DC equipment;
- Single-line diagrams of HV/MV/LV DC switchgears + DC equipment
- Participation in technical tendering group
Participation at Factory Acceptance Tests and Final Inspections of equipment.
July 2014 — October 2015
1 year 4 months
Alstom HYDRO (FRANCE, Grenoble)
Electrical MV/LV Principal Engineer
Kariba HPP, Zambia (refurbishment):
- Technical specifications for Auxiliary switchgears 0.4kV AC
- Calculation / Sizing / Description Notes for 220/380V AC and 110V DC equipment.
- Miscellaneous technical support.
Riga HPP, Latvia (refurbishment):
- Site survey;
- Technical specifications for MV Disconnecting switch (power evacuation), Main step-up Tr. Measuring and protection
equipment, etc.
- Generator voltage power evacuation equipment interlocking logic & diagrams;
- Calculation / Sizing / Description Notes for generator voltage power evacuation equipment4
- Miscellaneous technical support.
June 2008 — January 2012
3 years 8 months
Company "TREST GIDROMONTAZH''
Department Chief Deputy (electrical)
Type and brief description of projects, activity, profile, direct obligations:
1. Rybinskaya HPP (4x55MW + 2x63.2MW), RF (refurbishment)
2. Egorlikh-2 HPP (4x3.55MW), RF (new construction)
3. Baksan HPP (3x9MW), RF (full refurbishment)
4. Saratovskaya HPP (units 22 & 23: 2x10MW), RF (Refurbishment of horizontal units)
5. Kashkhatau (Sovetskaya) HPP 3х20MW, RF (New construction)
Main activities and functions:
- TPL function;
- Design/Refurbishment of MV power supply;
- Design/Refurbishment of LV & DC power supply;
- Site supervision activities (all above sites);
November 2005 — June 2008
2 years 8 months
ООО «Russian Engineering Company»
Manager
ООО «Russian Engineering Company» (Design branch of JSC "RUSAL"), Design-Energetic Directorate, Electro-technical department.
Type and brief description of projects, activity, profile, direct obligations
1. TPP Fria, Guinea:
* 220V DC switchboard. Project Design.
2. Kashkhatau (Sovetskaya) HPP 3х20MW, RF:
* Project Head Manager (TPL - electrical section); ;
* 220/380V & 10kV power supply diagram. Detailed Design; ;
* 220/380V & 10kV switchboards diagrams. Detailed Design; ;
* Selection of 220/380V switchgear equipment; ;
* Calculation of short-circuit currents;
* Selection of 220/380V & 10kV cables; ;
* 220V DC power supply diagram, 220V DC switchboard, calculation and selection of DC battery. Detailed Design.
3. Rogun HPP 6x600MW, Tadjikistan Republic:
* Participation in Bankable Feasibility Study group. Technical support.
4. Se-Kong HPP & Nam-Kong HPP, Lao
* Participation in Feasibility Study group.
March 2002 — October 2005
3 years 8 months
JSC «Institute Hydroproject»
Chief Specialist of Site Supervision Group. Tehri HPP, India
Main activities and functions:
- arrangement and erection of electro-technical equipment supervision;
- cable laying and erection supervision;
- cable-structures erection supervision;
- adaptation and revision of the Detailed Design.
March 1999 — October 2005
6 years 8 months
JSC «Institute Hydroproject»
Electrical design engineer
Type and brief description of projects, activity, profile, direct obligations
1. Tehri HPP 4x250MW, India (new construction);
2. Kapanda HPP 4x130MW, Angola (new construction);
3. Aswan HPP 12x175MW, Egypt (reconstruction);
4. Se-San 3 HPP 2x130MW, Vietnam (new construction);
5. Secaman-3 HPP 2x125MW, Vietnam (new construction)
Active jobs and major knowledge:
- Main and secondary electro-technical equipment arrangement inside the HPP building;
- Arrangement of cable routes;
- Selection of 220/380V & 6(10)kV switchgear equipment;
- Project design of 220/380V & 6(10)kV power supply diagrams;
- Calculation of short-circuit currents;
- Selection of 220/380V & 6(10)kV cables;
- secondary circuits - basic knowledge;
- earthing/protection earthing - basic knowledge.
Skills
Skill proficiency levels
Advanced level
Medium level
Basic level
About me
technical support, Coordination of engineering & documents, Factory Acceptance Testing, Technical Design > Technical Specification, Project Design, Detailed Design, Feasibility Studies, equipment selection, technical equipment supervision, 3D, Microsoft Office
Higher education
1997
Higher education
Moscow Engineering Power Institute
Electrical energy, Renewable power
Languages
Citizenship, travel time to work
Citizenship: Russia
Permission to work: Russia
Desired travel time to work: Doesn't matter
