Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas more than two weeks ago
Male, 41 year, born on 13 July 1984
Moscow, not willing to relocate, prepared for occasional business trips
Project manager
400 000 ₽ in hand
Specializations:
- Chief project engineer
- Power engineer, electrical engineer
- Project manager
Employment type: full time
Work experience 19 years 5 months
April 2020 — currently
6 years 2 months
"NefteGazEnergoService", LLC
Moscow, nges.pro/
Utilities... Show more
Senior manager of engineering projects
- Development and updating of heat and water supply systems projects according to the results of on-site inspections, at the stage of project design, detail design, and conducting final check as the chief engineer of the project
- Development of programs for the integrated improvements of public utilities infrastructure in cities
- Project management, overall responsibility for project execution of assigned projects
- Coordination design solutions with the Customer, coordination design solutions with the responsible authority (RF Ministry of Energy, local authorities, etc.)
Completed projects:
Projects for the development and updating of civil heat supply systems of Rostov-on-Don, Krasnodar, Stavropol, Ivanovo, Sochi, Chelyabinsk and other cities. Design solutions have been coordinated with the RF Ministry of Energy.
Project for the development of the water supply system of the Republic of Kalmykia, RF.
Project for the development and updating of the general utility system of Krasnodar, Ufa and Korolyov.
Project of stock-taking and cost estimating of the Iki-Burul pipeline water system (the pipeline water system from the Stavropol Territory to Elista, Republic of Kalmykia, RF).
July 2019 — March 2020
9 months
Project Diagnostic Bureau “Energo", LLC
Moscow, www.pdb-energo.ru/
Chief project engineer
- Handling the provision of electromagnetic compatibility at power engineering facilities (electric power substations, oil-production, and oil-refining enterprises, gas production enterprises, nuclear plants, hydropower plants, and heat electro power plants)
- Development of electromagnetic compatibility improving projects according to the results of on-site inspections, at the stage of project design, detail design, and conducting final check as the chief engineer of the project
- Project management, coordination design solutions with the Customer;
- Implementation of developed projects of electromagnetic compatibility, lightning protection and grounding improvement on-site
Completed projects:
Projects of electromagnetic compatibility, lightning protection and grounding system improvement at electrical substations (~ 50 substations of 35-500 kV) PJSC FGC UES (Rosseti Group) and at the facilities of PJSC Gazprom (objects of the Sakhalin-2 project).
February 2019 — July 2019
6 months
Transneft R&D, LLC (Transneft Research Institute for Oil and Oil Products Transportation)
Moscow, en.niitn.transneft.ru/
Head specialist of the foreign projects department
- Implementation of turn-key projects on electromagnetic compatibility, grounding and lightning protection of oil and oil products transportation facilities for foreign partners;
- On-site inspections and other proper works at the facilities of foreign partners;
- Monitoring and administration of projects with foreign partners
Completed projects:
Improving the lightning protection system of the RTC Béjaïa oil terminal of SONATRACH company (Algeria). Diagnosis, analysis of results, development of recommendations and defense of the proposed solutions directly at the RTC Béjaïa facility.
March 2017 — September 2018
1 year 7 months
Transneft R&D, LLC (Transneft Research Institute for Oil and Oil Products Transportation)
Moscow, en.niitn.transneft.ru/
Power Industry... Show more
Senior scientist
- Research and development in the field of grounding, lightning protection and electromagnetic compatibility for facilities and equipment of oil and oil products transportation
- Development of new equipment and improvement of existed equipment of pipelines facilities, raising of efficiency methods and reducing electricity consumption by the technological processes involved in oil transportation
- Development and improvement of the regulatory documentation for design, maintenance, construction, and operation of pipeline transport facilities
- Communication with foreign partners regarding electromagnetic compatibility, grounding and lightning protection of long-operated pipelines facilities
- Translation of technical regulatory documentation which could be useful in the working process
- Participation in different conferences, symposiums, and trade shows regarding oil transportation
Completed projects:
Updating the 5 main regulatory documents of the Transneft for the design, diagnosis, and operation of lightning protection, grounding, cathodic protection systems, taking into account accumulated experience and research results.
Conducting field studies of the mutual influence of grounding systems and cathodic protection; tests of active (electrolytic) grounding conductors at the facilities of the Transneft.
Development of a software package for the construction of lightning protection zones.
February 2014 — February 2017
3 years 1 month
Project Diagnostic Bureau “Energo", LLC
Moscow, www.pdb-energo.ru/
Power Industry... Show more
Chief project engineer
- Handling the provision of electromagnetic compatibility at power engineering facilities (electric power substations, oil-production, and oil-refining enterprises, gas production enterprises, nuclear plants, hydropower plants, and heat electro power plants)
- Development of electromagnetic compatibility improving projects according to the results of on-site inspections, at the stage of project design, detail design, and conducting final check as the chief engineer of the project
- Project management, coordination design solutions with the Customer;
- Implementation of developed projects of electromagnetic compatibility, lightning protection and grounding improvement on-site
Completed projects:
Projects of electromagnetic compatibility, lightning protection and grounding system improvement at electrical substations (~ 50 substations of 35-500 kV) PJSC FGC UES (Rosseti Group) and at the facilities of PJSC Gazprom (objects of the Sakhalin-2 project).
October 2011 — February 2014
2 years 5 months
“PROMEXPERTIZA” JSC
Moscow, www.promexpertiza.ru/
Power Industry... Show more
Leading Energy Auditor
- Handling energy audit of civil buildings, industrial plants, industrial processes and systems
- Conducting benchmarking, preliminary audit and general audit
- Estimation of energy-saving potential, based on analysis of whole energy use, metering of specific energy-consuming systems, etc.
- Estimation of costs and submission of bids for construction, engineering, and prepared contract documents
Completed projects:
Energy audit and energy consumption optimization projects for civil buildings of PJSC Sberbank and different industry facilities (chemical, pharmaceutical, oil and gas industries, etc.).
October 2008 — September 2011
3 years
“EZOP" LLC
Moscow, ezop.ru/
Power Industry... Show more
Chief project engineer
- Handling the provision of electromagnetic compatibility at power engineering facilities (electric power substations, oil-production, and oil-refining enterprises, gas production enterprises, nuclear plants, hydropower plants, and heat electro power plants)
- Development of electromagnetic compatibility improving projects according to the results of on-site inspections, at the stage of project design, detail design, and conducting final check as the chief engineer of the project
- Project management, coordination design solutions with the Customer;
- Implementation of developed projects of electromagnetic compatibility, lightning protection and grounding improvement on-site
Completed projects:
Projects of electromagnetic compatibility, lightning protection, and grounding system improvement of facilities of PJSC FGC UES (Rosseti Group) (~ 80 electrical substations of 35-500 kV), PJSC Gazprom (gas transmission stations), PJSC Transneft (oil transfer pumping stations), etc.
November 2007 — October 2008
1 year
“Atomenergoproekt" JSC
Moscow, www.aep.ru/
Power Industry... Show more
Engineer
- Analyzing the heat transfer processes of the reactor block premises
- Development of mathematical models of thermal systems in the reactor block
- Participation in an international project involving «JSC Atomenergoproekt» (Russia) and «GRS mbH» (Germany) on the nuclear power plant «Belene» (Bulgaria)
Completed projects:
Projects for the analysis of thermal processes in the premises of the reactor block of Belene NPP (Bulgaria), Bushehr NPP (Iran), Kudankulam NPP (India), Novovoronezh NPP (Russia).
August 2007 — November 2007
4 months
“Energokaskad” CJSC
Moscow, www.energokaskad.com/
Power Industry... Show more
Industrial Sales Manager
- Generated sales of electrical products to large energy and petrochemical companies
- Presented to project supervisors, procurement directors, and engineers
September 2006 — July 2007
11 months
“Nucleon” LLC, MSTU named after Bauman
Moscow
Power Industry... Show more
Research Assistant, engineer
- Took part in research effective heat exchange inside of a fuel assembly
- Performed the design calculations for the thermodynamic processes in a fuel assembly
- Then went on to publish two research papers on the topic of the research
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category BAbout me
I am qualified in survey works, information handling, report generation and team leadership for the execution of technical projects in the nuclear power engineering, electromagnetic compatibility, and energy audit fields.
IT skills:
• MS Windows, MS Office, Mathcad, Adobe Photoshop - advanced user
• AutoCAD – expert level
• Advanced user of solvers and codes in nuclear and electrical power engineering
Higher education
2007
Higher education
Power Plant Engineering, Nuclear reactors and plants
Languages
Citizenship, travel time to work
Citizenship: Russia
Permission to work: Russia
Desired travel time to work: Doesn't matter
